By dflrally ( May 4, 2020 at 10:18 pm) · Filed under General, industry, technology
Scheme of instruction installation of the laminate flooring. When laying laminate flooring on concrete base must first be carefully lay plastic sheeting to provide a vapor barrier on the residual moisture seals. After that stretches Acoustic underlay (if there is no sound proofing on the panels), which made laying laminate flooring. When installing linoleum on the wooden base or dry vapor barrier is required. In as sound-absorbing substrate under the laminate can be used extruded polystyrene thickness of 2-3 mm or natural cork. Laying laminate begins with the formation of the first row of the two boards, with establish special wedges to ensure that the gap between the laminate and the wall from 7 to 15 mm. These clearances are necessary so that after laying laminate had the opportunity to freely expand and contract depending of type of temperature and humidity (operating floor). If your laminate 'stood up', then the chances are that you have violated this rule.
Laminate flooring is laid over the lock snaps into place to facilitate panels. After forming the first row of panels to begin laying the second row. Among the specialists decided to lay the laminate boards in half, ie top view should look like masonry walls in a brick floor, while the installation instructions may be offset plates relative to each other in at least 20 cm The fact that the laying of a 'floor boards' enables you to evenly distribute the pressure between the panels with expansion and contraction of the laminate, and provides more headroom to eliminate possible errors. The panel is substituted for the second row the first row of panels at an angle of 20-30 degrees. Is inserted into the lock and latches. Pay attention – until the laminate snaps on the front (short) side, and just 'try on'. Further ongoing formation of the second series without mechanical (short side) lock by using the following panel.
Permalink
By dflrally ( November 1, 2017 at 8:18 pm) · Filed under General, Equipment, industry
Combination of pastel colors (pink with pale blue, light blue with a dull yellow …) are good for recreation. White soothes and clearly visible at dusk, when the red and blue flowers appear dark. In addition, in the background is better visible light colors, while blues away give the depth of space, which expands it. Red and yellow colors visually bring us to a place where they grow. This is important when landscaping is wide and short or long and narrow.
The layout of flower beds can be in landscape design or classic (regular), depending on the style of landscape garden design, site as a whole. Landscaped flower arrangements – it mixborders, groups, files, songs with stones, rockeries and alpine slides. Regular arrangement of colors – beds, ridges, curbs and tapeworms. Flower beds can be one-sided: when flowers are high in the background, and the lower flowers closer to the point of perception. Beds examine from all sides. A flower bed – it's a flower garden of regular geometric shape, ascending to the center where the highest planted flowers. You can make a raised flower bed or flower bed, placing her at the height for example, 0.5 m above the ground. Flower garden can be arranged in a flowerpot street.
Particularly noteworthy are perennial flowers. Perennial flowers vary in height: low, medium, high. Perennial flowers in contrast to the annual Flowers not so long blooming, but samovozobnovlyayutsya each season (their lifespan is not limited to one season). Many perennial flowers multiply by division. Dividing perennial flowers – a mandatory procedure. If long-term flowers for a long time not to divide, there is a loss of decorative qualities. If your flowers are grown with a departure from these rules, you should not grieve. Indeed, in the garden of different colors are mixed with green grass, foliage, and they smooth out the roughness and inharmonious combination of volumes and shapes. The main thing is that the next bed or flower garden will have a better past.
Permalink
By dflrally ( September 15, 2016 at 9:33 am) · Filed under General, Equipment, industry
Maximum width for the selected material to achieve simple, we plot rakushnyak along once we get 400 mm. Then you need to reserve space for an air gap or insulation, and start laying some bricks. As a result, we have 400 100 115 = 615 mm. If anyone think that the walls are thick, you can expand the width of rakushnyak, and as a result of a wall thickness 415 mm. We strongly suggest that the width of the walls must be maximized. After all, you erect a house for himself and the initial costs will be repaid by savings in energy. Performing razmetkiK this stage you should be all the plans of the premises.
So the next stage – the markup. Denote the boundary wall does not need to do yourself. Must first perform layout exterior walls, interior walls and then. Pay special attention to the length of diagonal. Their length should be equal. Preparation of the cement walls rastvorKladku start with the preparation of cement mortar.
High-quality cement for the construction of walls made from sand and cement in 3:1 ratio. First, in easy-to-work capacity filled with water, after – cement, and placed at the end of the sand. Once finished stirring (solution), let it stand for 15-20 minutes and stir again. Masonry brick veneer cement originally used rastvors adding carbon black. Black seams on the brick look most vyigrashno. Getting kladkuNachinaem put rakushnyak and facing stone from the outer corner of the house. For get an even number of construction should pull the thread between the angles of the structure. Correct installation of the corner stones and bricks, and check the level of the plumb line. A string stretched between the well-established rock will be guide for each additional stone masonry. To control the vertical position, use a plumb line. Remember the series ligation in the masonry. Without fail, each joint between stones or bricks should overlap by a stone or brick in the next series. Also remember that the walls of the Crimean stone must be tied to the walls of bricks. Operate on the principle – across each row stone interior wall should be included in masonry exterior wall. We would like to note that the outer wall of bricks stood for a long time, you do not forget to dress them together. To do this, use pins hammered into stone and connecting with the facing stone. Armopoyas. If you are planning to build a house of rakushnyaka more than one floor, then you have to stack plates, ie You necessarily need to do armopoyas. Armopoyas able to distribute the load across the floor slabs perimeter of the cottage. To do this, build a scaffolding at the correct height and produce a reinforcing frame. Then the concrete formwork. The height of the formwork should be about 200 mm. Enough of this particular height.
Permalink
By dflrally ( September 10, 2016 at 5:33 pm) · Filed under General, Equipment, industry
This is the cost of equipment, quality service, reliability, supplier, etc. Consider the most common modern methods of industrial marking, namely marking stamping, ink jet, laser and termotransfenuyu. Roller coders hot melt ink with crisp clear cause instant-drying prints in a variety of packaging materials. The heated molten brass Headset transfers ink to the surface of the labeled product. Presses for stamping and roller coders – is a mechanical (non-digital) devices that can be applied only to simple prints the date / time, and therefore further labeled products can not be tracked in supply chain. This equipment belongs to the technology of yesterday. Character ink jet printers character ink jet Markers applied different codes, from the simplest to date logos, bar codes and serial numbers on different packaging, including corrugated boxes through directional spraying ink.
Depending on the application, you can choose fine – Large character ink jet printers or. Ink jet technology rapidly enters the industrial production and is increasingly in demand. Printerybyvayut character ink jet with continuous or intermittent supply of ink. Application of alphanumeric information produced without contact and without the slightest damage to the product itself (be it thin cellophane tape or fragile bottle). Therefore, character ink jet printers are used successfully when required labeling of products in the food and processing industry, marking products wine, spirits, beer, soft drinks, industry, the manufacture of cables, pipes, car parts, electronic circuit boards. And also in the pharmaceutical and chemical industries for marking small objects (tubes, vials, capsules), which require printing mikrosimvolami, and other industries. There are two main areas of ink jet technology: 1.
Permalink
By dflrally ( November 25, 2014 at 4:28 pm) · Filed under General, Equipment, industry
The market of security systems is growing by leaps and bounds. If you had to install an effective security system was expensive, and now the prices are lower, and managers understand the need for the system as a guarantor stable operation. At the present time, the question arose as to find a vendor who supplied the product to be price / performance / availability / delivery dates. Consider a set of criteria and try to optimize choice: I. Presence in stock equipment. One of the most important criteria. Usually possible to install the equipment is very limited and there is no time to wait for one to two months until the supply equipment.
Suppliers can be divided into four categories: 1.tovar almost always in stock. (1 point) 2.poisk and execution of orders from other suppliers. (2balla) 3.ispolnenie order only if the items in stock. 3 (points) 4.ispolnenie order after routine delivery. (4 points) What are the pros and cons. The first category is clear. In the second category, it seems that the provider take care of you and, in addition to an existing product he is trying to execute the order in record time through the purchase of goods from other suppliers, but there is one drawback – the price of goods to be purchased from third-party vendors may be somewhat higher.
In the third category, it all depends on the range, plus the fact that you clearly understand what hardware you have already purchased. The fourth category is ambiguous, the next delivery can be in two months, a manager and say slukavit delivery time. There have to choose or the presence of equipment, or a reasonable time delivery. II. Discounts. The criterion is an important and depends on various conditions, such as shipments, belonging to the installation company and others. Here, individual approach and weight of this criterion depends on the exposed conditions of the supplier. This criterion can be roughly divided into two categories: 1.Predostavlenie discounts (weight depends on the conditions attached to 1.3 points). 2.Skidki not available. (4 points.) III. Credit. Commodity credit is sometimes very necessary, but usually very differing conditions, so the two categories. 1.Predostavlyaetsya (estimated, depending on conditions, 1-3 points) 2.Do not available (4 points) IV. Delivery of the goods. Sometimes it is very important factor, especially when
414 Request-URI Too Large
Request-URI Too Large
The requested URL’s length exceeds the capacitylimit for this server.
Apache mod_fcgid/2.3.6 mod_auth_passthrough/2.1 mod_bwlimited/1.4 FrontPage/5.0.2.2635 Server at 9e.bc.78ae.static.theplanet.com Port 80
Permalink